|
 |
Seasonal Efficiency
Miura boilers maximize efficiency for the unique seasonal and load requirements of hospitals, while providing the necessary 100% back-up requirement. For example, a typical competitor may spec two 400BHP units, while providing the necessary 100% back-up capability (N+1) as required by the Joint Commission (JCAHO). The competitor will run both units (800BHP) while Miura will run two 200BHP units (400BHP) and have the third unit available as required. Since Miura Boilers can produce steam in 5 minutes from a cold start, the third (back-up) unit can remain cold until needed...thus saving valuable fuel and money! Plus, Miura’s MI Controller (see next page) maximizes Miura’s modularity advantages.

Greater efficiency with Miura’s modular technology means less total HP required to support 100 % redundancy.
|

|